2021: Olembe Stadium Near Completion
- Par Elizabeth MOSIMA
- 06 mars 2019 10:10
- 0 Likes
The Minister Delegate at the Presidency in charge of Public Contracts Talba Malla visited construction works at Olembe yesterday, March 5, 2019.
It was an exceptional day at the Olembe Stadium construction site yesterday March 5, 2019. The Minister Delegate at the Presidency in charge of Public Contracts, Ibrahim Talba Malla, visited construction works at the Olembe Stadium earmarked for the hosting of the 2021 Africa Cup of Nations in Cameroon. The visit which was the first for the Minister aimed at evaluating the level of work done on the site.
As early as 9:30 a.m. the Minister and his crew were at the site for the inspection work. Immediately after his arrival, Minister Ibrahim Talba Malla, accompanied by the Governor of the Centre Region, Naseri Paul Bea, had a guided tour of the infrastructure led by officials of Piccini, the Italian firm in charge of the construction of the 60,000capacity stadium.
Speaking to journalists, Minister Ibrahim Talba Malla said the purpose of the visit was to evaluate the level of work and to discuss with the contractors in order to be sure that they will meet the deadline. He said he was impressed with the work that has been done so far and congratulated the workers for the effort. “The level they have reached is acceptable and now we have to push them to go further so that they can meet the target,” he said. Talba Malla said he is optimistic that together with the stakeholders the work will progress because the State and the entire people of Cameroon need the sport infrastructure.
The Controller of the Olembe construction site, Benoit Fabre, said the Minister was presented the stadium, the building for the five-star hotel, the swimming pool and the commercia...
Cet article complet est réservé aux abonnés
Déjà abonné ? Identifiez-vous >
Accédez en illimité à Cameroon Tribune Digital à partir de 26250 FCFA
Je M'abonne1 minute suffit pour vous abonner à Cameroon Tribune Digital !
- Votre numéro spécial cameroon-tribune en version numérique
- Des encarts
- Des appels d'offres exclusives
- D'avant-première (accès 24h avant la publication)
- Des éditions consultables sur tous supports (smartphone, tablettes, PC)
Commentaires