Kumba-Ekondo Titi Road: Tarring Begins This Week
- Par Benjamin MVOMO ESSOUMA
- 18 avril 2017 23:46
- 0 Likes
The 60 km stretch of road will cost over FCFA 32,2 Billion
The dream of the population of Kumba (Meme), Ekondo-Titi and Mundemba (Ndian) to have a good road network will finally become reality beginning. Travellers sometimes spent three nights on the road from Kumba to Mundemba during the rainy season, let alone transport their farm produce to the market.
The SOROUBAT-CM, contracted to construct the road, has completed their base at Small-Ekombe, a village along the Kumba-Mbonge road. Their heavy duty equipment has been installed at the base with the promise to begin work last Monday 17 April.
The Senior Divisional Officer (SDO) for Meme Division, Ntou’ou Ndong Chamberlin, visited the site on April 11, 2017, and was assured by the head of the construction company, Anis Ben Aasson, that their equipment had arrived. He added that they were ready to start effective work on the road. Aasson went further to explain that the delay came from the Douala sea port where they spent time to get their equipment.
The SDO, on his part, thanked the Cameroon Government and the Head of State, President Paul Biya for the concern he has for the people of this part of the country and urged the SOROUBAT-CM to start work immediately ensu...
Cet article complet est réservé aux abonnés
Déjà abonné ? Identifiez-vous >
Accédez en illimité à Cameroon Tribune Digital à partir de 26250 FCFA
Je M'abonne1 minute suffit pour vous abonner à Cameroon Tribune Digital !
- Votre numéro spécial cameroon-tribune en version numérique
- Des encarts
- Des appels d'offres exclusives
- D'avant-première (accès 24h avant la publication)
- Des éditions consultables sur tous supports (smartphone, tablettes, PC)
Commentaires